Concrete Driveway Cost Calculator: Alaska
Quick answer: a new plain concrete driveway for two cars (about 600 sq ft, 4 in. thick) in Alaska costs about $4,900 (range $3,600–$6,100). Replacing an old driveway, including tear-out, runs about $6,100.
Driveway cost by finish in Alaska
For a 600 sq ft driveway, 4 in. thick, new install.
| Finish | Typical | Range | Per sq ft |
|---|---|---|---|
| Plain gray (broom finish) | $4,900 | $3,600–$6,100 | $8.09 |
| Colored / stained | $6,100 | $4,900–$7,300 | $10.11 |
| Exposed aggregate | $6,700 | $5,500–$7,900 | $11.12 |
| Stamped / decorative | $9,100 | $7,300–$10,900 | $15.16 |
| Asphalt (for comparison) | $3,600 | $2,400–$4,900 | $6.06 |
Driveway cost by size
| Driveway | Area | Plain concrete | Stamped | Asphalt |
|---|---|---|---|---|
| 1-car (12×20) | 240 sq ft | $1,900 | $3,600 | $1,500 |
| 1-car long (12×33) | 400 sq ft | $3,200 | $6,100 | $2,400 |
| 2-car (20×30) | 600 sq ft | $4,900 | $9,100 | $3,600 |
| 2-car (24×30) | 720 sq ft | $5,800 | $10,900 | $4,400 |
| 3-car / long | 1,000 sq ft | $8,100 | $15,200 | $6,100 |
What drives driveway cost
Finish. Plain broom-finished concrete is cheapest. Color, exposed aggregate and stamping add labor and materials.
Site prep. Grading, a compacted gravel base and drainage matter more than anything for a driveway that does not crack.
Thickness and steel. 4 in. is standard for cars; 5–6 in. with rebar is better for trucks, RVs and cold climates.
Alaska's overall price level is 102.4 on the BEA index (U.S. = 100), the 14th most expensive of 51 states and DC. Labor is about 45% of a concrete job, so a typical project here costs 1% higher than the national average of $4,800.
Alaska vs. nearby states
| State | Price level | Plain, 600 sq ft |
|---|---|---|
| Alaska | 102.4 | $4,900 |
| Washington | 107.0 | $5,000 |
| Hawaii | 110.0 | $5,000 |
Frequently asked questions
How much does a concrete driveway cost in Alaska?
About $8.09 per sq ft for plain concrete, or $4,900 for a 600 sq ft two-car driveway.
Is concrete or asphalt cheaper?
Asphalt is cheaper up front, about $3,600 for the same 600 sq ft, but needs sealing every few years and lasts 15–25 years versus 25–40 for concrete.
How much concrete do I need for a driveway?
Multiply length × width × thickness in feet and divide by 27 for cubic yards. A 20×30 ft driveway 4 in. thick needs about 7.4 cubic yards, plus 10% extra.
How long before I can drive on new concrete?
Usually about 7 days for cars and up to 28 days for heavy vehicles, when concrete reaches most of its strength.
More Alaska home cost calculators
Sources: Angi, HomeGuide, Homewyse, Thumbtack and Concrete Network 2026 driveway cost data; U.S. BEA, Regional Price Parities by State, all items, 2024 (released Feb 2026). Estimates only; local quotes can differ. See our methodology.